Havering Museum, Romford, Essex
Here CCS undertook the floor screeds, drylined partitions, suspended ceilings, plastering and K Rend exterior rendering works to the new Havering Museum in Romford, Essex.
Our works involved the following:
- 500m2 Traditional cement:sand screeds laid bonded to the existing slab including various curved ramps
- GypLyner wall linings to exterior walls and metal stud partitions with deflection head details throughout
- MF suspended ceilings including high level curved bulkheads
- Interior plastering works to all walls and ceilings including forming arched window heads to existing square windows
- Exterior K Rend renders
Our works were undertaken under a strict time frame so that the Museum would be ready for opening to the public.

