CCS commence specialist floor screeding works to a new W H Smiths Super Store

February 21st, 2012

CCS have commenced floor screeding works to a new W H Smiths Super Store to a well known shopping centre in the South East.

Our works will involve several hundred metres of Ardex A35 ultra rapid drying floor screeds and over a 1,000m2 of STOPGAP 300HD self levellings screeds and Epoxy Resin DPM’s.

CCS will be pumping the self levelling screeds with its own in-house 3 phase M Tec Duomix 2000 screed pump.

CCS carry out over 600m2 of rapid drying floor screeds to a new Tesco Express in Manchester

February 21st, 2012

CCS have recently completed over 600m2 of Ardex A35 ultra rapid drying floor screeds and Grace Hydraduct cavity drainage systems to a new Tesco Express in Manchester.

For further information regarding rapid drying floor screeds and the Grace Hydraduct cavity drainage system please contact the office on 0845 116 1927.

CCS help ISG achieve “Very Good BREEAM” rating to Canada Water Library, Southwark

January 19th, 2012

CCS helped with there part in achieving a “Very Good BREEAM” rating to the new £15.3m library in Southwark.

The library has a floor space of 34,070 sq. ft and took 120 weeks to complete.

Our worked involved several hundred metres of FlexiDry F3 fast drying floor screeds on Celotex GA4000 thermal insulation and damp proof membranes.

CCS commence specialist self level screeds at 80 Bed Hotel in London

December 15th, 2011

CCS have commenced floor preparation and screeding works to a new 80 bedroom Hotel in the City of London.

The CCS team have been installing a thin base dB Resilent matting including fabric reinforcement in preparation for a 25-35mm thin section high strength cementitious polymer self levelling screed to be installed.

As the site is in the centre of London access and logistics are very complex. However the CCS team have made there stamp on the project with a professional attitude in able to get the job done – ahead of programme.

The CCS team have been mixing the specialist self levelling screeds with an M Tec Duo Mix (3 Phase) screed pump from the ground to the 7th floors.

Below are a few pictures of the project.

 

CCS secure specialist floor screeding works to new 80 bed hotel

November 23rd, 2011

CCS have successfully secured the floor screeding package to a new hotel in London.

Our works will involve over 2,000m2 of 25mm specialist self levelling screeds on resilient floor layer and reinforcing mesh to the 7 storey development. Our screed will be pumped using an M Tec Duo Mix self levelling screed pump.

The hotel is set to house 80 luxury bedrooms, a brasserie, various bars on the ground floor and an exclusive restuarant and bar on the 7th floor overlooking the City of London.

Our works are due to start early December 2011.

 

CCS commence floor screeds and drylining works at new Church School in London

November 23rd, 2011

CCS have commenced floor screeding and drylining works to a new Church school in London.

Our works involve the following:

  • 75mm Ardex A35 ultra rapid drying floor screeds on thermal insulation and damp proof membranes to ground floor and roof area
  • Dot & dab Plasterboard linings to all external walls
  • Internal stud partitions
  • Armstrong Dune Supreme Tegular 600x600 lay in grid ceilings

CCS secure fast drying screed works to Tesco Express in Leeds

November 9th, 2011

CCS have successfully secured the floor screeding works to a new Tesco Express in Leeds.

Our works will involve over 300m2 of Ardex A35 rapid drying screeds laid bonded to the exisiting concrete base with an SBR slurry grout. These works are due to be commenced over a very short programme period to enable the store to open ready for Christmas.

Our works are due to commence in mid November.

CCS secure rapid drying floor screeds to new High School in Hillingdon

November 4th, 2011

CCS recently commenced floor screeding works at to a new High School in Hillingdon.

Our works involved several hundred metres of fast drying floor screeds on underfloor heating and thermal insulation.

CCS installed the fast drying screed so that floor finishes could be installed just 21 days.

CCS secure fast drying floor screeds to Prezzo Restaurant

November 4th, 2011

CCS have successfully secured the floor screeding works to remodel a large Prezzo Restaurant in Essex.

Our works will involve several hundred metres of Ardex A35 rapid drying floor screeds on thermal insulation and Polythene DPMs.

Ardex A35 will allow the floor finishes to be installed after just 24 hours of installing the floor screed.

CCS complete fast drying screeds works to new Primary School in Essex

October 3rd, 2011

CCS have succesfully completed the floor screeding works to a new primary school in Essex.

Our works involved 500m2 of fast drying floor screeds on insulation and underfloor heating.